COLORBOND® roof for Caltex Croydon

Project gallery

Project Type

Colorbond Metal Roof + Soffit Installation

Location

Croydon

Roof Size

500m2 Roof, 300m2 Soffit

Duration

12 days

PROJECT DESCRIPTION

It was time to ensure the safety of this factory with a professional asbestos roof removal and installation of a striking new COLORBOND® roof.

This project involved the installation of a new COLORBOND® metal roof and soffit.

The scope included installation of safety wire, laydown of Polyair™ insulation, Colorbond® corrugated 0.48 roof sheets, KlipLok flashings, gutters, and fascias. The job also incorporated integrated installation of a ladder access system, platform roof walkway and safety harness points

We delivered this work to very strict timelines, and organisation and collaboration was pivotal to the success of the project. Budget Roofing liaised with up to 10 other trades to integrate the delivery of our work. Not only did we deliver the job on time, we maintained exceptional levels of safety, to the complete satisfaction of the builder.